default-header-image.jpg
 
 

Drywall and stucco update on the Cary Bonus Room Project

Drywall and Stucco pictures:  The drywall is being installed and over the next week it will be finished.  On the outside this is the first step in the stucco installation.  Since stucco is such a delicate product and because it is only as good as the installation (especially the waterproofing of the framing) the blue waterproofing is installed and then inspected by the manufacturer’s representative.  The guy on the scaffolding looked things over today and we have our certification letter in hand.  Now the stucco finish begins.  That will take about a week to do.  More photos to follow as the project moves forward.

Blue Ribbon Renovation, Blue Ribbon Residential, Blue Ribbon Construction, John Sperath, Design Build Remodeling, Remodeling Raleigh, Remodeling triangle