default-header-image.jpg
 
 

Raleigh almost whole house renovation

The Raleigh whole house remodel project is moving forward very nicely, the guys are finishing up the new hardwood stair treads today / tomorrow and the wood floor has been installed in the master bedroom (it has been covered with protection but there is a sneek preview of the color and style).  In the master closet, the closet shelving has been installed.  In the renovated master bathroom the cabinets have been installed and the plumbing fixtures are nearly finished (one faucet still on back order – figures – but will not cause a completion delay).  The remodeled laundry room cabinetry has been installed and in the entire remodeling project the painting is complete except for touch up.  What a trooper the owner has been.

Blue Ribbon Renovation, Blue Ribbon Residential, Blue Ribbon Construction, John Sperath, Design Build Remodeling, Remodeling Raleigh, Remodeling triangle

Leave a Reply