default-header-image.jpg
 
 

Raleigh Master Bath Project

The master bathroom has entered the sheet rock phase and there isn’t much to see or say except for watch out for the dust. All of the tile is on track, the interior trim will happen next week with the tile following very close behind. The cabinets will follow the tile and we’ll see mucho progress very soon.

Blue Ribbon Renovation, Blue Ribbon Residential, Blue Ribbon Construction, John Sperath, Design Build Remodeling, Remodeling Raleigh, Remodeling triangle

Leave a Reply