default-header-image.jpg
 
 

Michelle & Jeff’s bathroom renovation update

It must seem at times like we have dropped the ball on a project while we are waiting for manufacturers to fabricate some of the products we use. I’m sure that that is the case with this bathroom. The cultured marble company didn’t tell us about a change in their process and what we had prepared for them for the shower floor would not work and we had to rip it out to allow for their re-designed product. Hopefully that will be installed mid week and we can move ahead with the completion of their beautiful bath. It should move ahead quickly after that.

Blue Ribbon Renovation, Blue Ribbon Residential, Blue Ribbon Construction, John Sperath, Design Build Remodeling, Remodeling Raleigh, Remodeling triangle

Leave a Reply